Automation

Automation · Power Automate · Power Platform

Your Power Automate Flows Live in a Free Developer Environment? They Go Dark on 15 December 2026 — Export Them Before Microsoft Suspends It

First published 14 November 2026 · Updated on 14 November 2026 · Verified against Microsoft Learn’s “Important changes (deprecations) coming in Power Platform”, “Export solutions”, “Export a solution”, “Distribute a model-driven app using a solution”, “Enable managed environments”, “Automatic deletion of Power Platform environments”, “Export and import a non-solution flow” and “Import a solution” pages — all read in full on 14 November 2026

Merroway Editorial · Verified against governing standards and vendor documentation.

The fast answer

First, check whether this is even your environment: in the Power Platform admin center go to Manage > Environments and filter where Type is Developer and Managed is No. If nothing matches, this retirement does not touch you. If it does, pick one of two routes — and do it before 15 December 2026. Route 1, export: in Power Apps, open Solutions, pick each unmanaged solution, choose Publish all changes and Export — the download is a .zip of your work. Flows that were built outside any solution get exported one by one from Power Automate as a Package (.zip). Then import them into a sandbox or another environment your organisation provides. Route 2, convert: ask your admin to enable Managed Environments on the developer environment before 15 December — it keeps everything in place, but everyone who builds and runs in it then needs a premium licence, because Managed Environments use rights are not included in the Developer Plan. There is no third route: no setting, no re-signup and no free licence keeps an unmanaged developer environment alive past 15 December.

Advertisements

What you are looking at, in plain words

Start with what the environment is. When you signed up for the free Power Apps Developer Plan, Power Platform created a personal developer environment for you — a place to build and test apps, flows, agents and sites without paying for a licence. Microsoft calls that kind of environment unmanaged, because it sits outside the governance controls admins rely on — Managed Environments policies, usage insights and sharing limits. Microsoft is now retiring unmanaged developer environments, and its own deprecations page gives the reason in one sentence: moving development work to managed environments gives admins consistent visibility and control over every environment in the tenant, while makers keep a personal space to build and test. The retirement happens in three phases, and the dates are the whole story.

Microsoft’s table on the deprecations page is exact. Creation ends 15 November 2026: signing up for the Power Apps Developer Plan no longer creates a developer environment, and users can’t create new unmanaged developer environments from Power Apps, the Power Platform admin center, PowerShell or the Power Platform CLI. Suspension starts 15 December 2026: existing unmanaged developer environments are suspended, and “their apps, flows, agents, Power Pages developer sites, and data aren’t available.” Deletion starts 15 January 2027: suspended unmanaged developer environments are deleted. Microsoft is blunt about what happens if you do nothing: “If you don’t convert an environment to a managed environment or move its solutions before then, its makers and users lose access to its apps, flows, agents, Power Pages developer sites, and data.”

Understand what “suspended” means, because it is not the same as a flow breaking. When a single flow fails repeatedly, Power Automate suspends that flow — the environment, and everything else in it, keeps working. Here it is the other way round: the whole environment is suspended, so every flow in it stops, every app stops opening, every agent stops, every Power Pages developer site goes dark, and the data inside is not available. You cannot fix that from inside the environment, because you cannot get into it. And the suspension is not a punishment for inactivity: Microsoft’s own automatic-deletion page says the inactivity cleanup “is separate from the deprecation of unmanaged developer environments” and that “regardless of activity, unmanaged developer environments are suspended starting December 15, 2026.” A flow that runs every day keeps an environment active — but it does not save it from 15 December.

What is not affected is just as important. Managed developer environments are not affected — that includes the personal developer environments that environment routing creates, which are managed by default. Production, sandbox, trial and default environments are not affected. And solutions you export from an unmanaged developer environment before it is suspended are not affected — that is why this guide leads with the export. The developer environment type itself continues to exist, but only as a managed developer environment, and going forward each user can create only one managed developer environment. Existing managed developer environments are not changed, even if a user already has more than one.

Keep two nearby deadlines separate from this one, or you will act on the wrong date. First, Dataverse for Teams: those environments also stop being created on 15 November 2026, but theirs are suspended on 15 September 2027 and decommissioned on 30 October 2027 — almost a year later than the developer-environment dates. Second, the inactivity cleanup: a developer environment that sits unused is automatically disabled after 30 days of no activity, and deleted 15 days after that if nobody re-enables it — and you get seven days to recover it once it is deleted. That is a different mechanism with a different clock, and unlike the 15 December suspension, activity resets it: any create, update or launch, or even a scheduled flow run, counts as activity. Managed developer environments use a 60-day inactivity threshold instead of 30. If your environment was already disabled for inactivity, re-enabling it before 15 December still leaves you with the same 15 December deadline — the re-enable buys you time, not an exemption.

One more retirement sits on the same Microsoft page, and it is easy to confuse with this one. Copilot in the designer for cloud flows and agent flows retires on 30 November 2026. AI Builder’s free credits ended on 1 November 2026 — a separate retirement covered in the same live guide, not on the deprecations page. The Copilot retirement changes how you build flows; it does not delete, move or change existing flows. It is covered in the live Merroway guide Power Automate AI Builder Credits End 1 Nov 2026 — and Copilot Leaves the Designer 30 Nov 2026: What to Do Before Your Flows Break. If your flows still run but Copilot has vanished from the designer, that is the 30 November retirement, not the 15 December suspension — and the fix for it is in that guide, not this one.

Unmanaged developer environment Free Power Apps Developer Plan — being retired in three phases 15 Nov 2026 Creation ends No new unmanaged developer environments from any route 15 Dec 2026 Suspension starts Apps, flows, agents, sites and data unavailable 15 Jan 2027 Deletion starts Suspended environments are deleted Two ways through — both before 15 Dec 2026 Way through 1 — Export Export solutions + flow packages before 15 Dec Keep the .zip files safe Way through 2 — Convert Admin enables Managed Environments before 15 Dec Needs a premium licence
Drawn map — not a screenshot: the three phases of the retirement, and the two ways through before 15 December 2026.

Step 0 — Confirm which environment you have

  1. Check the environment type and managed flag. Sign in to the Power Platform admin center (admin.powerplatform.microsoft.com), go to Manage > Environments, and filter the list where Type is Developer and Managed is No. That filter is Microsoft’s own instruction for identifying the environments this retirement touches. If your environment shows Managed: Yes, it is not affected — stop here. If you are not an admin, ask yours to run this check; any user with permission to view environment details can see the managed property, but only a Power Platform Administrator or Dynamics 365 Administrator can change it.
  2. Check whether it is a Developer Plan environment. If you got the environment by signing up for the free Power Apps Developer Plan, it is unmanaged unless an admin has since enabled Managed Environments on it. If someone in your organisation set the environment up for you, ask them — the admin center filter in step 1 is the answer either way.
  3. Check the Last activity column. On the same Environments list, read Last activity. An environment with no activity for 30 days is disabled by the separate inactivity cleanup — and if it is already disabled, re-enable it first so you can export from it. But remember: activity does not save an unmanaged developer environment from 15 December, and re-enabling buys you time, not an exemption.
  4. List what lives in the environment. Open the environment in Power Apps and Power Automate and note down: which solutions hold your work, which flows sit outside any solution, which apps and agents you still use, and whether any Power Pages developer site runs from it. Sites in an unmanaged developer environment are suspended and deleted along with the environment — Microsoft says the only way to keep a site is to convert the environment to a managed environment before 15 December 2026. Exporting a solution does not save a Power Pages site on its own.
  5. Check who has a premium licence. Ask your admin whether the people who build and run in the environment hold a standalone Power Apps, Power Automate, Copilot Studio, Power Pages or Dynamics 365 licence. If nobody does, the convert route (Fix 4) is closed and the export route is the only one — decide that now, not on 14 December.
DateWhat happens
15 Nov 2026Creation ends — signing up for the Power Apps Developer Plan no longer creates a developer environment; no new unmanaged developer environments from Power Apps, the admin center, PowerShell or the CLI
30 Nov 2026A different retirement on the same Microsoft page: Copilot leaves the designer for cloud flows and agent flows — existing flows are not deleted, moved or changed (see the live AI Builder guide)
15 Dec 2026Suspension starts — existing unmanaged developer environments are suspended; apps, flows, agents, Power Pages developer sites and data aren’t available
15 Jan 2027Deletion starts — suspended unmanaged developer environments are deleted
15 Sep 2027Dataverse for Teams environments that aren’t upgraded to Dataverse are suspended — a different timetable, do not mix it with the developer-environment dates
30 Oct 2027Dataverse for Teams environments that aren’t upgraded are decommissioned
14 Nov 2026This guide’s check: all dates above read in full on Microsoft Learn on 14 November 2026

About this table: the 15 November, 15 December and 15 January dates, the 30 November Copilot retirement, and the Dataverse for Teams dates (15 September and 30 October 2027) are all from Microsoft Learn’s “Important changes (deprecations) coming in Power Platform” page, read in full on 14 November 2026. The 30-day inactivity disable, the 15-day deletion after disable and the seven-day recovery window are from Microsoft Learn’s “Automatic deletion of Power Platform environments” page, also read in full on 14 November 2026.

The fixes, in order

  1. Fix 1 — Export your solutions (the main escape route). Sign in to Power Apps and select Solutions from the left navigation. In the list, select the unmanaged solution you want to export, then select Export. On the Before you export pane, choose Publish all changes first — only published components are exported, so anything you edited but never published is left out of the file. Then, on the Export this solution pane, pick the package type: Managed or Unmanaged. Microsoft’s own guidance is to export as Managed for the environment you are moving to, and to keep the Unmanaged version as your source copy — Microsoft says unmanaged versions should be checked into source control and that importing unmanaged solutions into non-development environments is not recommended. Accept the version number Power Apps offers, or enter your own, and select Export. The export can take several minutes; when it finishes, the .zip file lands in your browser’s download folder. Do this for every solution in the environment, one by one — and check each .zip actually downloaded before you move on. Two hard limits from Microsoft: you can’t export managed solutions, and you can’t export the Default Solution — if your work lives only in the Default Solution, move it into your own unmanaged solution first (Fix 2’s package export is the fallback for a single flow).
  2. Fix 2 — Export the flows that aren’t in a solution, one by one. A flow built outside any solution cannot travel inside a solution export — it needs its own package. Sign in to Power Automate, go to My flows > Cloud flows, select the flow, then on the menu select the down arrow next to Export and choose Package (.zip). Enter a name and description for the package, then select Export — the .zip downloads shortly after, and if it doesn’t start automatically, select Download. The package carries the flow and its dependent resources with it. Three conditions from Microsoft: only the flow’s owner or co-owner can export it; you must have third-party cookies enabled; and if your admin has turned on the Create in Dataverse solutions setting (solutions by default), Microsoft says you can’t import packages that contain non-solution flows — you need to use solution import instead, so export through solutions. Repeat for every non-solution flow — there is no bulk package export.
  3. Fix 3 — Import into the new home, and check the connections. For a solution: sign in to Power Automate in the target environment, select Solutions, then Import, browse to the solution .zip, select it, and select Next — if there are no errors, the import completes within a few moments. You can’t import a solution into an environment where that solution already exists. For a single-flow package: in the target environment go to My flows, select Import > Import Package (Legacy), upload the .zip, and under Import setup choose Create as New or Update for the flow, then set up each related resource and select Import. Then do the step people skip: reconnect everything. Imported flows try to return to the state they were in when exported, but only if their connection references get connections — if the importing user doesn’t have permissions to all the connections in the flow, those connections need to be shared with them before the flow can be turned on. When a solution is imported, all its components are owned by the user who performs the import.
  4. Fix 4 — Ask your admin to convert the environment to a managed environment (the keep-everything route). If the people who build and run in the environment hold a premium licence, this is the better route: the environment keeps its apps, flows, agents and data, and remains a developer environment. The admin signs in to the Power Platform admin center, goes to Manage > Environments, selects the ellipsis next to the environment, and selects Enable Managed Environments — then configures the settings and selects Enable. Two requirements from Microsoft: the person doing it needs the Power Platform Administrator or Dynamics 365 Administrator role in Microsoft Entra ID (a Delegated Admin or an Environment Admin can’t change the property), and the users need a premium licence to run apps and flows in a managed environment — Managed Environments are included as an entitlement with standalone Power Apps, Power Automate, Microsoft Copilot Studio, Power Pages and Dynamics 365 licences, and are not included in the Power Apps Developer Plan. Do this before 15 December 2026: after the suspension starts, the convert route is gone with the environment. Note also that developer environments don’t need Dataverse to enable Managed Environments — that requirement applies to production, sandbox and trial types, not to developer ones.
  5. Fix 5 — If nobody has a premium licence, move to a trial or an organisation environment. Microsoft’s own answer to “I don’t have licensing for Managed Environments” is twofold. To try premium capabilities, use a standard trial environment — they remain available — but export your solutions again before the trial ends if you want to keep your work. For ongoing development and testing, export your solutions and import them into a sandbox or other environment your organisation provides. And for makers who still need a personal space: ask your admin to turn on environment routing, which automatically creates a managed developer environment for each maker — one per user, managed by default, and not affected by this retirement. The admin should also review the tenant’s Developer environment assignments setting while they are in there.

Do not wait until 15 December. A single solution export takes minutes, but a whole environment — every solution, every standalone flow, every connection to re-check — takes an afternoon, and you cannot export anything at all once the suspension starts: the environment, its apps, its flows and its data are all unavailable. Microsoft’s deprecations page documents no recovery window for a suspended developer environment, and no way back is documented after deletion starts on 15 January 2027 — the seven-day recovery window you may have read about belongs to the separate inactivity cleanup, not to this retirement. Export first, argue about licences second.

Three different “my flow stopped” problems — do not mix them up. If Power Automate itself suspended your flow after repeated failures, that is a flow fault, not an environment fault, and the fix is to fix the failure first, then turn the flow back on — a companion guide on fixing a suspended flow is not yet published. If your flow stopped because the person who owned it left, that is an ownerless-flow problem — a companion guide on that is not yet published either. And if Copilot vanished from the designer but your flows still run, that is the 30 November 2026 Copilot retirement — covered in the live guide Power Automate AI Builder Credits End 1 Nov 2026 — and Copilot Leaves the Designer 30 Nov 2026: What to Do Before Your Flows Break. Only an environment that shows Type: Developer and Managed: No in the admin center is this guide’s problem.

Prove it worked

For the export route, the proof is in your downloads folder and in the target environment — not in the old one. Every solution from Step 0’s list should have a matching .zip file, and every non-solution flow should have a matching package .zip. Open one solution .zip and check the Workflows folder is inside it — each exported workflow sits there as a JSON file. Then import one solution into the target environment and run its most important flow end to end: it should trigger, run, and produce the result it always did. Check the flow is on in the target environment and that its connections show as connected. For the convert route, the proof is in the admin center: open Manage > Environments, find the environment, and check Managed now reads Yes — and open one app and run one flow in it to confirm they still work. Only when the work runs in its new home, or the environment shows as managed, is the job done.

Still not working? Work this ladder in order

  1. The Export button is missing or greyed out on a solution. Check you picked an unmanaged solution — Microsoft says you can’t export managed solutions, and you can’t export the Default Solution either. Create your own unmanaged solution, add the components to it, and export that instead.
  2. The exported .zip is missing flows you know you built. You exported before publishing. Only published components are exported — go back, choose Publish all changes on the Before you export pane, and export again.
  3. There is no Package (.zip) entry when you try to export a single flow. Either you are not the flow’s owner or co-owner — only they can export it — or your admin has turned on the Create in Dataverse solutions setting, in which case the Package (.zip) route doesn’t apply: Microsoft says packages that contain non-solution flows can’t be imported and you must use solutions instead. Ask your admin which one it is.
  4. The package export or import fails in the browser. Microsoft requires third-party cookies enabled to export and import non-solution flows. Enable them for the Power Automate site and try again.
  5. The import fails with the solution already existing. Microsoft is explicit: you can’t import a solution into an environment in which the solution already exists. Import it as an update to the existing solution instead, or remove the old copy first — and check you are importing into the right environment.
  6. The flow imported but stays off. Imported flows only turn themselves back on if they were on when exported and their connection references get connections. Check each connection in the target environment, get the missing ones shared with the importing user, then turn the flow on by hand and run it once.
  7. Your admin can’t enable Managed Environments. They need the Power Platform Administrator or Dynamics 365 Administrator role in Microsoft Entra ID — a Delegated Admin or an Environment Admin can’t change the property. If the button is there but the licence check fails, nobody in the environment holds a qualifying premium licence, and the export route is the only one left.
  8. The environment is already suspended. If 15 December has passed, the environment is suspended and you cannot export from it or convert it. Microsoft’s deprecations page documents no self-service way back — contact your Power Platform admin and Microsoft Support, and treat any .zip files you exported earlier as your only copy of the work.

Mistakes that make it worse

  • Waiting until 15 December to start — an afternoon’s work that cannot be done at all once the suspension starts.
  • Exporting a solution without publishing first — unpublished changes are silently left out of the .zip.
  • Exporting the Default Solution, or a managed solution — Microsoft says neither can be exported; put your work in your own unmanaged solution.
  • Exporting only the solutions and forgetting the flows built outside them — those need their own Package (.zip) each.
  • Treating the suspension like a flow fault — turning a flow back on, or fixing a connection, does nothing when the whole environment is suspended.
  • Assuming a busy environment is safe — the 15 December suspension applies regardless of activity; only the separate inactivity cleanup is reset by activity.
  • Mixing up the Dataverse for Teams dates — those environments are suspended in September 2027, not December 2026.
  • Importing the unmanaged export straight into a production environment — export as Managed for the target and keep the Unmanaged copy as your source.
  • Trying to keep the free environment alive with a workaround — there is none; Microsoft retires the environment, and the only free paths are exporting your work or a trial environment.
  • Forgetting the Power Pages site — a site in the environment is suspended and deleted with it; only converting the environment before 15 December keeps it.
Advertisements

Frequently asked questions

How do I know if my environment is an unmanaged developer environment?

Check in the Power Platform admin center: go to Manage, then Environments, and filter the list where Type is Developer and Managed is No. If you signed up for the free Power Apps Developer Plan, your environment is an unmanaged developer environment unless an admin has since enabled Managed Environments on it. Managed developer environments — including the ones environment routing creates — are not affected by this retirement.

What exactly stops working on 15 December 2026?

Microsoft suspends the whole environment. Its apps, flows, agents, Power Pages developer sites and data aren't available: flows stop running, apps won't open, and you can't get at the data. It is a suspension of the environment, not a fault in any one flow — so turning a single flow back on, or fixing a connection, does nothing.

Is my environment deleted on 15 December 2026?

No — deletion starts 15 January 2027. Between 15 December 2026 and 15 January 2027 the environment is suspended: still there, but nothing in it is available. Export your solutions before 15 December 2026 if you want to keep a copy of your work — that is Microsoft's own advice, word for word: “Export your solutions before December 15, 2026 if you want to keep a copy of your work.”

Can I keep my free developer environment for free?

No. There is no free way to keep an unmanaged developer environment past 15 December 2026, and this guide teaches no workaround to keep one. Converting it to a managed environment needs premium licences — Microsoft says Managed Environments use rights aren't included in the Power Apps Developer Plan. The free options are to export your work before 15 December and move it into an environment your organisation provides, or to build and test in a standard trial environment, which Microsoft says remains available.

What licence do I need to convert my developer environment to a managed environment?

Managed Environments are included as an entitlement with standalone Power Apps, Power Automate, Microsoft Copilot Studio, Power Pages and Dynamics 365 licences. An admin enables it in the Power Platform admin center — Manage, then Environments, the ellipsis next to the environment, then Enable Managed Environments — and needs the Power Platform Administrator or Dynamics 365 Administrator role to do it. The people who build and run apps and flows in the managed environment need a premium licence too.

Should I export a solution, or export each flow on its own?

Export a solution if your work is in one: it carries apps, flows, tables and connection references together. Only published components are exported, so choose Publish all changes first, and you can't export managed solutions or the Default Solution. If a flow was built outside any solution, export it on its own as a Package (.zip) from My flows, then Cloud flows — only the flow's owner or co-owner can export it, and you need third-party cookies enabled. If your admin has turned on the Create in Dataverse solutions setting, Microsoft says packages that contain non-solution flows can't be imported — you must use solutions instead.

My flow stopped, but my environment is not a developer environment. What else could it be?

Three different things stop flows, and they need different fixes. If Power Automate suspended the flow itself after repeated failures, that is a different fault — a companion guide on fixing a suspended flow is not yet published. If the flow stopped because the person who owned it left, that is ownerless-flow territory — a companion guide on that is not yet published either. Copilot leaves the Power Automate designer on 30 November 2026 — that is on the same Microsoft deprecations page — and AI Builder's free credits ended 1 November 2026, a separate retirement covered in the live guide “Power Automate AI Builder Credits End 1 Nov 2026 — and Copilot Leaves the Designer 30 Nov 2026”, linked in Sources.

Is this the same as the Dataverse for Teams deadline?

No. Dataverse for Teams environments also stop being created on 15 November 2026, but theirs are suspended on 15 September 2027 and decommissioned on 30 October 2027 — a different timetable on the same Microsoft page. Don't mix the two dates up: a developer environment goes dark on 15 December 2026, a Dataverse for Teams environment keeps working until September 2027.

Sources

Microsoft Learn — Important changes (deprecations) coming in Power Platform (the “Deprecation of unmanaged developer environments and the Power Apps Developer Plan” section: the three-phase timeline — creation ends 15 November 2026, suspension starts 15 December 2026, deletion starts 15 January 2027; what suspension makes unavailable; the managed-environment exception; the one-managed-developer-environment-per-user limit; the convert and export actions; the premium-licence requirement; the Power Pages warning; the Dataverse for Teams timeline; and the Copilot-in-the-designer retirement on 30 November 2026, all read in full on 14 November 2026) · Microsoft Learn — Export solutions (publish all changes before export; only published components are exported; managed solutions and the Default Solution can’t be exported; Managed vs Unmanaged package choice; the export .zip goes to the browser’s download folder; read in full on 14 November 2026) · Microsoft Learn — Export a solution (the Power Automate export steps; a flow that is only in the Default Solution should be added to an existing solution or a new solution created for it; you can’t export managed solutions; exported workflows sit as JSON files in the solution zip’s Workflows folder; read in full on 14 November 2026) · Microsoft Learn — Distribute a model-driven app using a solution (“Typically you export a solution as Managed because you want to continue to work on the project in the current environment. Unmanaged versions of your solutions should be considered your source for Microsoft Power Platform assets and checked into your source control system. We don't recommend that you import unmanaged solutions into non-development environments.”; read in full on 14 November 2026) · Microsoft Learn — Enable managed environments (Power Platform Administrator or Dynamics 365 Administrator role required; Manage > Environments > ellipsis > Enable Managed Environments; developer environments don’t need Dataverse; read in full on 14 November 2026) · Microsoft Learn — Automatic deletion of Power Platform environments (the inactivity cleanup is separate from the deprecation; 30 days of inactivity disables a developer environment, deletion 15 days after disable, seven days to recover; managed developer environments use a 60-day threshold; activity — including scheduled flow runs — resets the clock; read in full on 14 November 2026) · Microsoft Learn — Export and import a non-solution flow (Package (.zip) export; only the owner or co-owner can export; Environment Maker role needed to import; third-party cookies required; the Create in Dataverse solutions setting blocks package import (Microsoft: you can’t import packages that contain non-solution flows); read in full on 14 November 2026) · Microsoft Learn — Import a solution (Solutions > Import; can’t import into an environment where the solution already exists; imported components are owned by the importer; flows attempt to restore their exported state when connections exist; read in full on 14 November 2026) · Side note, named secondary sources, not Microsoft’s words: IncWorx — Power Platform Developer Environment (3 November 2026) and 2toLead — Power Platform retirement deadlines (5 November 2026) both corroborate the three dates; every load-bearing claim in this guide rests on the Microsoft Learn pages above, not on these two · Merroway — Power Automate AI Builder Credits End 1 Nov 2026 — and Copilot Leaves the Designer 30 Nov 2026: What to Do Before Your Flows Break (live guide; the Copilot retirement on the same deprecations page, and the AI Builder credits retirement covered in that guide).

Verification note: the deprecations page (2,073 lines), the export-solutions page, the Power Automate export-a-solution page (79 lines), the distribute-a-model-driven-app page (84 lines), the enable-managed-environments page, the automatic-deletion page (310 lines), the non-solution flow export/import page and the import-a-solution page were each read in full on 14 November 2026 (pages crawled 14 November 2026, 02:43–02:47 UTC). The three dates — 15 November 2026, 15 December 2026 and 15 January 2027 — are from Microsoft’s own timeline table, and the guide quotes the page’s “aren’t available” and “Export your solutions before December 15, 2026” wording verbatim. The research note’s dates needed no correction. Two refinements from live verification: the 30-day inactivity rule is a disable, not a deletion — deletion follows 15 days after the disable, with a seven-day recovery window — and managed developer environments use a 60-day inactivity threshold; and the deprecations page gives no recovery window for an environment deleted under this retirement, so the guide promises none. Dedup: the live sitemap (207 URLs, checked 14 November 2026) contains no live guide covering developer environments or the Developer Plan; the live AI Builder guide covers a different retirement on the same page and is linked from this guide; the two sibling guides in this batch (a suspended flow, and ownerless flows) are staging-only and are referred to in plain text as “not yet published”, never linked.